Stuttgart Airport, New South-West Control Centre

  • Client: Flughafen Stuttgart GmbH
  • Location: Stuttgart
  • Design stages according to HOAI: 1 – 8
  • BIM application: BIM pilot project, 3D planning, visualisation (photo and walkthrough), VR glasses, model-based cost calculation, creation of BAP, CDE data management
  • Date: 2017 – present
back